From equipment installation and plant maintenance to structural works, piping systems and fabrication, our experienced team is committed to delivering practical, reliable and quality engineering solutions in accordance with project requirements and site conditions. Explore some of our featured projects below.

SS Pole For Equalization Pond

Location : Farm's Best Food Industries Sdn Bhd, Masjid Tanah Melaka

Scope of Work :

i. Supplied and installed a new stainless steel hollow mixer pole, including the chain block hanger.

ii. Fabricated and installed the mixer base and supplied and installed new top and bottom hangers.

Suction Piping For EQ Pond

Location : Farm's Best Food Industries Sdn Bhd, Melaka

Scope of Work :

i. Installed the pump guide.

ii. Supplied the required labour, tools, materials, transport and consumables.

iii. Supplied and installed 1 unit of 6" water check valve for the EQ suction line.

Make Good Compounding Area's Level 4 Catwalk

Location : Ansell Seremban Sdn Bhd, Negeri Sembilan

Scope of Work :

i. Applied a 3coat system anti-corrosion painting.

ii. Cut and disposed of the existing worn-out chequered plate applied with 3coat system
anti-corrosion painting.

iii. Cut and disposed of the existing worn-out platform and installed a new platform using 3mm chequered plate with a 50mm (H) kick plate.

Upgrading, Fabrication and Installation of 160-Ft Mild Steel Conveyor Body Complete with
Conveyor and Accessories

Location: FGV Kernel Products Sdn Bhd, Kuantan Pahang

Scope of Work :

i. Fabricated and installed a 160-ft conveyor cover.

ii. Fabricated and installed a 160-ft conveyor at CTC1.

iii. Fabricated, supplied and installed 2 units of new stainless steel chutes.

Replaced / Installed Stairs And Handrail

Location: FGV Fertiliser Sdn Bhd, Kuantan Pahang

Scope of Work :

i. Installed the staircase/access from the E17B conveyor to the dryer drum and cooler drum.

ii. Main entrance ladder was installed from the ground floor to the top floor (oversize screen level).

iii. Installed the staircase and handrail at the MOTC level and plant platform with an estimated platform length/area of 50m².

Fabricate And Install New Cyclone (16th)

Location : WRP Asia Pacific Sdn Bhd, Sepang

Scope of Work :

i. Fabricated new cyclone body as dimension was given.

ii. Supplied labour, tools, material, consumable and transport.

iii. Cleaning and polishing internal cyclone body with using power tools.

Oil Tank Farm Upgrading Work

Location : PEM Fasteners, Kawasan Perusahaan Senawang, Negeri Sembilan

Scope of Work :

i. Fabricated a new oil stand.

ii. Relocated 2units of oil pumps and installed them at the new location with
proper mounting.

iii. Relocated the existing oil tank around 1m using a 7-ton crane, including modification of the existing bracket and chemical plugs.

Relocated Blancher Machine c/w Air, Water, Steam, Piping Modification To Install At New Location

Location : Farm's Best Food Industries Sdn Bhd, Melaka

Scope of Work :

i. Conducted test run and commissioning of the Blancher Machine.

ii. Relocated the existing blancher machine from its existing location to the designated location.

iii. Extended and modified the existing water, steam and air piping connections using the necessary fittings.

Carbonator 5 And 6, Installation of 10" Bypass Complete With Service Platform

Location : Central Sugar Refinery Canteen, Shah Alam Selangor

Scope of Work :

i. Cut and installed a 10" bypass pipe using SS304 Sch. 10S, complete with valve and SS ANSI 150# flanges.

ii. Dismantled the existing 8" and 6" bypass valves and installed blind complete with PTFE spiral wound-gaskets.

iii. Insulated the bypass pipe with 1.5mm thick mineral wool and jacketed it with 0.8mm aluminium, sealed with silicone.

Chimney Fabrication & Installation

Location : Ansell N.P. Sdn Bhd, Melaka

Scope of Work :

i. Fabricated the stainless steel exhaust duct and chimney.

ii. Supplied labour, tools, materials, transport and consumables.

iii. Dismantled and replaced / painted the existing ceiling and roof prior installation works with similar material as per on site.

For a detailed overview of our project experience, including
Our Clients, Project Locations and Scopes of Work,
please refer to our complete project portfolio.

Explore Our Complete Project
Experience

821950162_1484698526876904_2765872874203711861_n
CLIENT PROJECT LOCATION PROJECT TITLED & SCOPES Of WORK PROJECT VALUE
ANCOM CROP CARE SDN BHD
–
Drain cover project
37,820.00
ANSELL N.P SDN SBH
Melaka
Concrete platform and strengthening works at NP Compounding platform.
53,850.00
ANSELL N.P SDN SBH
Melaka
Relocation of washer from bay 1 to washer bay 2
91,200.00
ANSELL N.P SDN SBH
Melaka
Variation order no 2 on to relocate 4 dl washer from bay 1 and
45,625.00
ANSELL N.P SDN SBH
Melaka
Variation order to relocate 1 unit 3 dl washer is inside the factory and 2 unit washer from outside of the factory
82,632.32
ANSELL N.P SDN SBH
Melaka
Demolish partition and ceiling and brick wall around blowers in bay 2
115,000.00
ANSELL N.P SDN SBH
Melaka
Relocation cosmo dryer
35,000.00
ANSELL N.P SDN SBH
Melaka
Tank fabrication
51,200.00
ANSELL N.P SDN SBH
Melaka
Fabrication & install 1 unit of MS3 Latex mixing tank
36,115.20
CAREPLUS
NEGERI SEMBILAN
Latex transfer pipe for G.floor to 2nd floor
38,800.00
CAREPLUS
NEGERI SEMBILAN
Latex transfer line from tanker zone
32,000.00
CENVIRO
NEGERI SEMBILAN
Install insulation for top body air preheater inc1
87,000.00
CENVIRO
NEGERI SEMBILAN
Refurbishment of cooling air ducting inc1
94,500.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Cement job at operation office building area
68,750.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Install new platform at molasses loading area
53,000.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Relocation and install 3 units air receiving tank
45,000.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Recondision back existing platform at filter area
38,400.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Repair the windows and change the doors around the office (westport warehouse)
57,590.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Cement job at operation office buildind area
45,000.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Repair the fence
60,000.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Paint the basement inside the warehouse and repair the damaged wall
105,580.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Alcom dach & wand metal roofing additional re-roofing
214,590.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Alcom dach & wand metal roofing additional re-roofing sps packing area
102,900.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Alcom dach & wand metal roofing additional re-roofing – power house
60,360.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Repair the fence
60,000.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Alcom dach & wand metal roofing additional re-roofing – plant
46,080.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Piping jobs at csr (ms)
331,300.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Piping jobs at csr (ss)
406,870.00
CENTRAL SUGAR REFINERY
SHAH ALAM
New hot water to top up niro tank
32,238.50
CENTRAL SUGAR REFINERY
SHAH ALAM
Stainless steel water tank
53,820.00
CENTRAL SUGAR REFINERY
SHAH ALAM
Crystalizer 5 nozzle replace
31,400.00
KIM HIN CERAMIC (SEREMBAN)
SEREMBAN
Fabrication 15 tonne silo
300,000.00
KIM HIN CERAMIC (SEREMBAN)
SEREMBAN
Fabrication s/s silo
90,000.00
PURECIRCLE
–
Supply ers line 1 ml2-axial flow pump repair & service
45,000.00
PURECIRCLE
SEREMBAN
Demolish 2 unit ms tank
65,800.00
CLIENT PROJECT LOCATION PROJECT TITLED & SCOPES Of WORK PROJECT VALUE
MALAYAN FISH OIL
PORT KLANG
To supply, Labour, tools, materials, consumable, transport and accomodation For Job Mixing Reactor
140,000.00
KINETICS SYSTEMS MALAYSIA SDN. BHD.
SHAH ALAM
To supply, Labour, tools, transport and consumable to Fix New Piping Work.
14,000.00
KINETICS SYSTEMS MALAYSIA SDN. BHD.
SHAH ALAM
To supply, Labour, tools, transport and consumable to Cut and Dismantle Panel Frame.
4000.00
SAMSUNG ELETRONIC DISPLAY (M) SDN.BHD
KUALA LUMPUR
To supply labour, tools, transport material and consumable backhoe, braker to replace underground Fire Pipe (Leaking)
8,850.00
ETS NETWORK SDN BHD
DATARAN PRIMA SELANGOR
To supply labour, tools, manpower, transport and consumable to fabricate and install insulation
8,850.00
ETS NETWORK SDN BHD
DATARAN PRIMA SELANGOR
To remove the existing damage fan and continue with checking and Install back. Remove the damage existing fan and Install New Fan
3000.00
SODEXO MALAYSIA SDN BHD
PETALING JAYA
To supply, labour, tools, consumable and transport to do Hacking and dismantle old titles and replace new titles at Staff Kitchen
8630.30
PURITEC TECHNOLOGIES (M) SDN BHD
KULIM KEDAH
Repair the existing SS ducting to prevent air leak in future cut the existing ducting.
Installation work at Level 3 Production Cut the Old CDA main header
10,000.00
JOHNSON MATTHEY SDN.BHD
NEGERI SEMBILAN
To supply, labour, tools, materials, labour, consumable cranes to pathing another Layer Chequer plate at existing plate foam.
32000.00
JOHNSON MATTHEY SDN.BHD
NEGERI SEMBILAN
To supply, labour, tools, transport , material, consumable for Reposition 2 units of Wrapping Machine’s
13,000.00
JOHNSON MATTHEY SDN.BHD
NEGERI SEMBILAN
To supply, labour, tools, transport , material, consumable for Installation of Heavy Duty Black/Yellow Rubber Hump
17,640.00
JOHNSON MATTHEY SDN.BHD
NEGERI SEMBILAN
To supply, labour, tools, transport , material, consumable and manpower to install new pvc curtain
6,000.00
JOHNSON MATTHEY SDN.BHD
NEGERI SEMBILAN
To supply, labour, tools, transport , material, consumable To Install Divider Stone at Lobby Walk Way to Café area.
12,000.00
CENTRAL SUGAR REFINERY
SHAH ALAM
To supply labour, tools, transport, materials, consumable to Fabricate New Movable Shed.
To supply labour, tools, transport, materials, consumable to Fabricate New Movable.
36000.00
CENTRAL SUGAR REFINERY
SHAH ALAM
To provide material, work tools, skilled labour and all the necessary for Road Premix Work.als, consumable to Fabricate New Movable.
48,000.00
CENTRAL SUGAR REFINERY
SHAH ALAM
To supply manpower, tools, material, transport, and consumabe to Replace Rusted Paip at Clarification Line (2 Lines)
5000.00
GOLD COAST MORIB INTERNATIONAL RESORT
BANTING
TO FABRICATE NEW RALLING AT THE PIER AREA TO TAKE OUT THE OLD RALLING
36,000.00
FARMS BEST FOOD INDUSTRIES SDN BHD
AYER KEROH MELAKA
To supply manpower, tools, material, transport consumble for replace 6″ carbon steel piping at waste water treatment (WWT) area.
15000.00
FARMS BEST FOOD INDUSTRIES SDN BHD
AYER KEROH MELAKA
TO SUPPLY MANPOWER, TOOLS, MATERIAL, TRANSPORT AND CONSUMABLE ITEMS FOR REPLACE NEW PIPING AT CHILLER 8
15,784.00
FARMS BEST FOOD INDUSTRIES SDN BHD
AYER KEROH MELAKA
To supply manpower, tools, material, toxic, transport consumble for replace 6″ carbon steel piping at waste water treatment (WWT) area:
24,000.00
MEDICERAM SDN BHD
NILAI
To supply labour, tools, consumable, transport and materials to Relocate Conveyor 2 units.
13000
PURECIRCLE SDN.BHD
BANDAR ENSTEK NILAI
To Supply, tools, materials, equipment and manpower to repair WWTP MBR Pipeline.
6,000.00
PURECIRCLE SDN.BHD
BANDAR ENSTEK NILAI
To Supply, tools, materials, equipments and manpower to modify and Install 2 units of ball valve at vacuum pipeline at HD1 and HD2 Line 2.
25,500.00
PURECIRCLE SDN.BHD
BANDAR ENSTEK NILAI
To supply tools, materials, equipment & manpower needed for: High Rise Cleaning at VD Workshop (Effected area after Process Indicent)
80,000.00
PURECIRCLE SDN.BHD
BANDAR ENSTEK NILAI
To supply tools, materials, equipment & manpower to install new ventilation pipe for dryer at SD#2 as per picture in the BOQ (19000029 PR)
9,600.00
PURECIRCLE SDN.BHD
BANDAR ENSTEK NILAI
To supply tools, materials, equipment & manpower together with testing and commissioning to replace top strainer for Activated Carbon Filter FRP Pressure vessel at RO Plant Line 1
27,300.00
HEAVEABOARD BERHAD
GEMAS
To replace 2 I beam of structure of TCC to Return Silo inclusive of materials, labour, equipment and necessary crane and sky lift
6,500.00
HEAVEABOARD BERHAD
GEMAS
To supply labour, tools transport, material, consumable to Replace & Install Dust Silo Deluge Pipe with New Sprinkle Nozzles.
14,500.00
HEAVEABOARD BERHAD
GEMAS
To supply manpower, tools , material, transport and consumable for Dryer Fine Platform @ first floor
60,000.00
HEAVEABOARD BERHAD
GEMAS
To supply labour, tools transport, cosumble, material skylift to install Deluge Piping at Cylone (Globus) & Cylone (myer) Flaker
10000.00
HEAVEABOARD BERHAD
GEMAS
To supply manpower, tools, material, equipment, and transports to dismantle the old and install new platform c/w ralling and rusted I BEAM support
60000.00
KELLOGG ASIA PRODUCT SDN BHD
BANDAR ESNTEK NILAI
TO SUPPLY TOOLS, TRANSPORT, MATERIALS,MANPOWER, EQUIPMENTS, CONSUMBLE FOR PAINTING THE STRUCTURES & SUPPORT AT SYSTEM 10 LINE 7.
9,000.00
KELLOGG ASIA PRODUCT SDN BHD
BANDAR ESNTEK NILAI
To supply qualified manpower, tools, equipment, transport material and accommodation for the job
5,000.00
KOPERASI NLFCS BERHAD
KUALA LUMPUR
To supply and Install :- 1) 3 Fasa – Red, Yellow and Blue and neutral rewiring 16mm 24mm, 4 meter and Install new IPS 24 pcs.
3,000.00
KOPERASI NLFCS BERHAD
KUALA LUMPUR
To supply labour, tools, transport and consumable items to change Ceiling Old Fan to New Fan at Workers Hostel. Additonal items for Fixing Ceiling Fan
1) Gang switch
2) Gang switch
3) Fan hook
4) 1hp Air Cond Capasitor.
2025.00
KOPERASI NLFCS BERHAD
KUALA LUMPUR
TO SUPPLY AND INSTALL ONE UNIT OF DAIKIN BRAND 1.5HP AIR CONDITION.
3000.00
THISTLE HOTEL
PORT DICKSON
To supply tools , manpower , transports and consumable items for insulation hot water and use power tools blasting the hotwater tank platform (repaint).
9500.00
THISTLE HOTEL
PORT DICKSON
To supply tools , manpower , transports & material consumble for Repair Pipe leaking, at VIP Room ( President swift
7150.00
THISTLE HOTEL
PORT DICKSON
To supply tools , manpower , transports & material consumble for back the wall (2600 x 2800 H) at Boiler Room
12000.00
SINDUTCH CABLE MANUFACTURER SDN.BHD
MELAKA
TO SUPPLY MANPOWER, TOOLS, CONSUMABLE, TRANSPORT, MASKING TAPE, PAINTING AND CLEANING.
30000.00
SINDUTCH CABLE MANUFACTURER SDN.BHD
MELAKA
To supply labour, tools transport, material, consumable to Replace & Install Dust Silo Deluge Pipe with New Sprinkle Nozzles.
14500.00
ALLOY MTD GROUP
AMPANGAN
TO SUPPLY, TRANSPORT , TOOLS & MANPOWER TO REPAIR MOULDS
7500.00
ALLOY MTD GROUP
AMPANGAN
TO SUPPLY, TRANSPORT , TOOLS & MANPOWER TO MAKE HOLES AT 10 UNITS MOULDS
3800.00
LAGUNA
PORTDICKSON
To supply tools , transports , manpower , accommodation and consumable items to replace new rubber liner at below
15000.00
NESTLE
CHEMBONG
To supply labour to perform 6 units of silo tank cleaning job as per Nestle Manufacturing , Chembong Negeri
42000.00